News Search

Showing 251 - 260 of 289 results.

  • May 23, 2014

    From May 27 until August 3, the entrance to the College of Physicians and Surgeons building, as well as the staircase in front of the dean’s suite, will be closed for renovations. During this time, individuals should use accessible entrances located at the William Black Building, 650 West 168th St., or the Vanderbilt Clinic, 622 West 168th St.

  • April 1, 2014

    Current student tenants can now take advantage of several new ways to renew their leases.

  • March 1, 2014

    All new students admitted for the 2014-2015 academic year should only apply for student and couples’ housing beginning Tuesday, April 15. Applications submitted before April 15 will be cancelled.

  • September 25, 2013

    CUMC's Green Team will meet on Thursday, November 7 at 4 pm. Email cumc-energy@columbia.edu to receive location information and join the team. All students, faculty and staff are welcome and invited. We hope to see you there!

  • August 12, 2013

    The next meeting of the CUMC Green Team will be held Thursday, September 5 at 4:30 pm. Email cumc-energy@columbia.edu for location information. All students, faculty and staff are welcome to attend.

  • July 18, 2013

    URGENT REQUEST TO CONSERVE ENERGY A heat advisory has been issued, and Con Edison has asked all institutional sites to reduce power usage. In turn, we ask all faculty and staff to conserve energy during this period of high demand and record-breaking temperatures. Both the University and Hospital have reduced grid-based electrical consumption by running our emergency power generation systems during peak-demand times and have otherwise further reduced energy consumption.

  • July 3, 2013

    In June 2013, the new ColumbiaDoctors practice achieved Gold certification under LEED Interior Design + Construction, exceeding project expectations of LEED Silver.

  • June 21, 2013

    The 14-story glass tower was designed by world-renowned, New York-based architects Diller Scofidio + Renfro, in collaboration with Gensler. It will include technology-rich classrooms, an advanced simulation center, an auditorium, and unique study spaces to encourage interdisciplinary learning and teamwork. The building, located at 104 Haven Ave., is anticipated to open in 2016.

  • June 3, 2013

    Fort Washington Greenmarket is open Tuesdays from 8am-4pm beginning June 4

  • May 3, 2013

    The first meeting of the CUMC Green Team will be held on Thursday, May 16, 2013 at 4 PM within the Hammer Building, Room LL 103. Please feel free to bring colleagues who are interested, as well. This will be an open meeting for us to introduce ourselves, learn about what CUMC is currently doing and brainstorm our Green Team goals for a sustainable CUMC. Faculty, staff and students (including existing EcoReps) are welcome. We’ll have a fun little welcome gift for you, too!

Pages