William Black Building Scaffolding Removal, Mar. 12-13
March 9, 2021
Beginning at 6 p.m. on Friday, March 12, we will be dismantling and removing the sidewalk bridge (scaffold) located at the Black Building street level along Fort Washington Avenue. We currently anticipate the sidewalk bridge removal to be completed by Saturday, March 13.
While the sidewalk bridge is being removed, the entrance to the Black Building/VP&S loading dock will remain accessible; however, there will be short periods in which the loading dock will be blocked. Representatives onsite will coordinate with delivery drivers to minimize any impact.