exclamation mark icon

Black Bldg. Urgent Steam Shutdown, Apr. 16, 10 a.m. - 2 p.m.

Steam systems throughout the William Black Building will be unavailable from 10 a.m. until approximately 2 p.m. on Tuesday, April 16, due to emergency repairs.

  • While we conduct the repairs, there will be no hot water, heating, sterilization, autoclaves, steam tables, or dishwashers available throughout floors 4 through 20.
  • During this time, occupants also may notice slightly cooler building temperatures.
  • Eyewash devices and overhead emergency shower units will be functional but will be supplied with cold water only. Accordingly, please consider limiting research operations that have significant potential for splash or face and bodily exposure during the shutdown.

 

We apologize for the inconvenience and appreciate your cooperation during this time.

For questions or concerns, please contact Fred Arce, assistant director of Engineering, at aa164@cumc.columbia.edu.