Georgian Residence Hot Water Disruption, Sept. 24-25

Hot water service will be temporarily unavailable throughout the Georgian Building from 5 p.m. Thursday, September 24, through approximately 7 p.m. Friday, September 25, due to maintenance and inspection of the building’s boiler system.

Highlights of what to expect:

  • Cold water will remain operational throughout the building.
  • Once hot water service returns, please run your faucets for a few minutes to allow the water to move through the building.  

For any questions or concerns, please contact Praveen Prakesh, director of housing engineering, at pp2895@cumc.columbia.edu.

Back to top