VP&S Bldg.: 15th Floor Flooring Replacement, Various Dates

We will be installing new flooring in the elevator lobby and adjoining corridors of the 15th floor in the Vagelos College of Physicians and Surgeons Building. 

Anticipated Installation Schedule:

  • West Corridor: 6 p.m. Friday, September 30 – 4 p.m., Sunday, October 2
  • Elevator Lobby and East Corridor: 6 p.m., Friday, October 7 – 4 p.m., Sunday, October 9

There will no access to this section of the corridor and the elevator lobby. For your safety, please observe all posted signage and use alternate routes during the above dates and times. 

If you have any questions, concerns, please contact Joe Francomano, CARE Construction Manager, at jf2933@cumc.columbia.edu.